PROCEEDINGS OF THE  PUBLIC CONSULTATION HELD ON 02.06.2007   AT H.P.M. PARADISE, M.T.

Chief Planner, Area Plans Unit, CMDA welcomed the gathering and informed that the Master Plan – II notified for Public Consultation is only draft plan and after the public consultation and examining the   objections / suggestions, the Master Plan-II will be finalised.  It was also informed that CMDA has proposed to hold a series of consultative meetings at various locations in Chennai Metropolitan Area and the schedule has already been released in the Press.     It is also available in the official Website of CMDA.

A Power point presentation explaining  the salient features of Draft Second Master Plan II was presented by Thiru S. Selvakumar, Deputy Planner, CMDA.     After the presentation, the Chief Planner, CMDA initiated the discussions.

The following are the major points that emanated  during the public consultation.

Points raised / suggestions made:

 

Points raised / Suggestion made

Remarks given

(1)   Thiru Rajagopal, Ambattur.

 

Ambattur Industrial Estate should also be declared as I.T. Corridor as a number of I.T buildings such as TCS, HCL are functioning.  The present Industrial Estate Bus Stand  should be shifted to a spacious place.

Ambattur Industrial Estate is already an   Industrial area wherein I.T. developments are permissible and hence it is not necessary to declare as I.T. Corridor.  The IT Corridor declaration on either side of the Old Mahabalipuram Road (OMR) is proposed to allow I.T. developments in the area irrespective of land use zoning.  Regarding the Bus stand, the Local Body to take note of.  

 

Roads should be maintained in Mogappair and link road should be developed from Mogappair to  Poonamallee High Road.
Basic facilities should be provided.
Unauthorised constructions should be removed.

Adequate linkage through net work of roads proposed in the Draft Master   Plan-II.
Other suggestions were  general in nature and taken note of.

 

(2)  Thiru S. Venkatesan, Secretary, Elango Nagar Makkal Nala Mantram, Padi.

 

 The Elango Nagar at Padi does not have proper drainage and water supply system.   The under ground water is contaminated by  solid waste and iron.

The Commissioner of the Ambathur  Municipality explained about their proposal to provide sewerage system covering the entire Municipality.

(3)

Thiru P. Vijayaraj, Padikuppam Road, Five Star Apartment Association

 

No Metro Water connection available in this area inspite of the fact that the CMWSSB  Water pipe passes through  this  area.  There are 168 houses and no drainage facility  available.  The High Tension Line passes through this area should be shifted.
Garbage disposal yard to be developed.

 

The  Commissioner, Ambattur Municipality stated that detailed project report for providing water supply by CMWSSB will be finalized before 15.06.2007.  Also action is being taken by CMWSSB for providing under ground drainage.

(4)

Thiru Uma Kannan, Councilor, Ward No. 32, Ambattur Municipality.

 

Ambattur Municipality should be included in the Chennai City. During rainy  season there is no proper drainage for letting out   the excess rain water.

A Committee  is constituted by the Government to examine the proposal  of extending the City limit or to  constitute two or three more Corporations.
Rainwater Harvesting has to be done by the individual owners so that there may not be any excess water to be let out. 
It was also informed that PWD has proposed to alleviate flooding problems in the area and once land acquisition is completed, they will execute the project.

 

  

(5)

Thiru P.K. Moorthy, Councilor, Ambattur Municipality.

 

 Roads within Municipality should be developed. The Road from Lucas TVS upto Thirumullaivoyal is in  a very bad shape.

 

The suggestion taken note of.

(6)

Thiru Varadachari, Athipattu.

 

There was a proposal to lay a road in S.No.444 but so far no acquisition is done in the past 30 years.  Also there are lot of houses already constructed in this land and it is not known what action will be taken by the Government.

 

The arterial road proposed in the First Master Plan to a width of 200’ is continued in the Draft Second Master Plan also.  It is a road necessary to solve traffic problems in the area. Concerned Department will be requested to take early action for acquisition and forming the road.

 

(7)

Thiru Gajapathy.

 

 

In an approved layout at Puzhal the area earmarked for park has been sold for some other purpose.

It is informed that the layout might have been approved by D.T.C.P prior to 1975. If any such unauthorised conversion has occurred  the individual may represent to the Local Body, so that they can verify their records and take necessary action.   As per present procedure layout will be approved only after handing over of parks, play ground and roads to the concerned Local Body.

(8)

Thiru Viswanathan, Padi.

 

 

Under ground drainage is not available in this area.  Also traffic congestion.

Remarks in Item No.2 above may   be seen.

(9)

Tmt. Parimaladevi, Ayapakkam

 

 

In Ayapakkam because of the Dumping yard  smoke is a nuisance.    Also ground water is polluted.

Local Bodies are taking action to locate  the solid waste disposal sites and scientific land fill sites.

(10)

Subramaniam, Elango Nagar

 

 

There is no under ground drainage in                     Dr. Moorthy Nagar.  Also no water supply available in this area.

Remarks in Item No.2  above may be seen.

(11)

Thiru Purushothaman.

 

The area has been declared as Residential area.  But a number of leather companies have coming up in this area which are nuisance  to the residents.  He has requested to declare as Residential areas or Primary Residential area.

The applicant was requested to check with the land use proposed in the Draft Second Master Plan-II, and if he is aggrieved he may give representation to CMDA which will be considered on its merits.

(12)

The President,   Dinesh Nagar Residents Welfare Association, Dinesh Nagar, Melayanambakkam,Ward No.1, Thiruverkadu.  

 

There are at present 500 plots  in this Nagar when the residents applied for Planning Permission it was stated that  a proposed 400’ road is proposed in this area and Planning Permission is not issuable.
There is no proper drainage system for letting out excess Rainwater and hence Storm  Water Drain should be constructed in Ward No.1,2,3,4 & 5 for a stretch of 3 to 5 Kms.

Arterial road (200 feet width) is  proposed to connect Thirumangalam Junction in A.A.Nagar with Outer Ring Road and it is required to complete the road net work.
As regards Storm Water drains it is provided by the Local Body concerned and they may take up the matter with the Local Body.

(13)

Thiru Moorthy, Ambattur.

 

Lot of encroachment in Govt. Poramboke  land.  The lakes are not properly maintained and all lakes are polluted.  In addition lot of encroachment in the lake area  

In the Draft Maser Plan all water bodies are zoned specifically for that purpose and encroachments were not recognised.

(14)

Thiru Sundarm, Marxist Party, Ambattur.

 

First Master Plan prepared for the year
1971-1991 and Second Master Plan for the period 2005-2026. It is not known what was   the Master Plan implemented between                      1991 – 2006.
No coordination between Government agencies.  No action plan specified in the Second Draft Master Plan.

As per Section 32of the Act, until a Master Plan is superseded by another Master Plan it is in force.  Legally  the First Master Plan is in force  till this date and it will be superseded by the Second Master Plan which is  under Public Consultation.  When the concerned Departments / Agencies prepare their action plans / schemes, they take into account of the Master Plan proposals  and act accordingly.  There is adequate coordination among the Govt. agencies who deliver public service in urban developments.

(15)

Thiru Sridhi, Thiruverkadu, Ward No.11

 

No Telephone facility provided in this area.

It will be taken up with the concerned Dept. / Agency when he represents in writing to CMDA.

(16)

Thiru  Pandurangan, Thiruverkadu.

 

  The houses in the TNHB Scheme at Ayapakkam let out  the drainage water in the Kolladi   which should be avoided.

Public should take up the matter  with the Avadi  Municipality through the concerned Local Body, since the sewerage system provided in the TNHB area at the location is maintained by the Municipality.

(17)

Thiru Devaraj, Ward No.21, Patravakkam, Ambattur.

 

 

No basic facility provided in this area.
No water Supply facility  provided by the Local Body.

 

Commissioner of the Municipality explained about the action taken by it.

(18)

Thiru P. Vadivel, Anna Nagar (West)

 

It is proposed to extend the MRTS from Velachery to St.Thomas Mount  then upto Villivakkam.   It is suggested that in the first instance MRTS may be extended up to Villivakkam and priority should be given to this stretch.

It is proposed to introduce Metro Rail for Chennai  and the alignment passes through the IRR from Guindy up to Anna Nagar.  It will be  taken up for implementation shortly.

(19)

Thiru Raman, Councilor, Ward No.6.

 

 

200’ NH Bye pass road is crossing through the area.  Whether  service Road  will be provided on both sides of the proposed road.   

The proposed road is laid by National Highways and there will be     service roads on both sides of the Road;  crossings at regular intervals are also proposed.

(20)

Thiru Anja Santhanam, Councilor, Ward No.4

 

In adequate water supply and no basic facility provided in this ward.

The Commissioner Ambattur Municipality replied that it is proposed to implement the new water supply scheme which will cater to this area also.

 

 